I have a clip in the timeline.
I unlinked. Then attempted to use Alt + . and Alt + , - I was unable to perfectly sync.
The clip is twenty five minutes. The out of sync begins around fifteen minutes. Then ever so slightly the audio slips out of sync with the speaker. Thus its not that the whole clip is out of sych, rather, the last half of the clip slips out of sync.
Is there an obvious fix that I am missing? Thanks!
Type: AVI Movie
File Size: 10GB
Image Size: 720x480
Pixel Depth:32
Frame Rate: 29:97
Source Audio Format: 48000Hz -16 bit Stereo
Project Audio Format: 48000Hz -16 bit floating point Stereo
Average Date Rate: 3.6 MB sec
Pixel Aspect Ration: 0:9
AVI Details:
1 video track 1 audio track
Interleave: 1: 28:99
Video Track 1:
Frame rate: 29.97 fps
Frame size: 720x480
Depth: 24bits
Audio Track 1
Rate 48000 sample/sec
Sample size: 16bits
It sounds like you have a case of dynamic OOS (Out Of Sync), i.e. the OOS drifts over time.
That can be caused by several things, and testing to narrow down the cause is the best course of action, but in the meantime, this ARTICLE might be helpful to getting the Project done.
Good luck,
Hunt
North America
Europe, Middle East and Africa
Asia Pacific