Skip navigation
joec925
Currently Being Moderated

Synchronize two clips at start and end marker

Sep 10, 2012 6:21 AM

CS4. Two clips from helicopter tour. One an outside viewing camera and the other a camera showing the inside view. Want to both camera's content in split screen. Problem is that the two clips are not the same length in time measurement. The properties of both are the same: mp4; 1280x960, 24 pixel depth, 29.97 frame rate; audio-48Khz and 16b; pixel aspect ration =1. Have a numbered marker at the time start points desired for each clip and another numbered marker for the desired end point sync. I have synchronized on the start points ok. The end point markers are 05 seconds, 24 frames between the two clips. Looks like the solution is to reduce the number of frames in the longer clip to sync the end markers without affecting the start marker s sync. Any suggestions?

 
Replies
  • Currently Being Moderated
    Sep 10, 2012 12:19 PM   in reply to joec925

    How badly would the Sequence be affected, if you just Cut out the 05:24 from the end of Camera 2?

     

    Another option would be to adjust the Speed of Camera 2, to match Camera 1.

     

    Good luck,

     

    Hunt

     
    |
    Mark as:
  • Currently Being Moderated
    Sep 11, 2012 10:47 AM   in reply to Bill Hunt

    yikes.. aside from Bill's good ideas...

     

    I got this brain storm....since you're at 29.97 ( 30 ) fps....you need about 204 frames MORE in the clip that's short...

     

    If you manually choose frames throughout the sequence and "export frame" and then add that to project...little by little you end up padding the short clip with extra frames...and you would do that 204 times.

     

    hehe... if you spread it out over the whole thing when you "choose" to do so...you may actually end up having them both look like they are close to showing the same "action" througout...ending together etc.

     

    this might be a crazy idea though.

     

     
    |
    Mark as:
  • Currently Being Moderated
    Sep 13, 2012 9:19 AM   in reply to joec925

    good going !   I hope the sped up clip didnt make people sound like "the chipmunks movie".

     

    hehe...if you give Bill the "correct" answer it will help him. After he gets 1000 points for correct answers he gets a free lobster dinner from Adobe !

     

     
    |
    Mark as:
  • Currently Being Moderated
    Sep 14, 2012 7:12 AM   in reply to joec925

    When I adjusted the long clip, the end, numbered marker did not slide with the clip. Looks like a numbered marker is fixed in a timecode position not within the clip itself.

    You are correct. A Numbered Marker is fixed to the Timeline. A Clip Marker will be fixed to the Clip, and will move with it.

     

    Good luck,

     

    Hunt

     
    |
    Mark as:
  • Currently Being Moderated
    Sep 14, 2012 7:13 AM   in reply to able123

    After he gets 1000 points for correct answers he gets a free lobster dinner from Adobe !

     

    I think that Harm got the free "Maine Lobster Lunch... "

     

    Hunt

     
    |
    Mark as:

More Like This

  • Retrieving data ...

Bookmarked By (0)

Answers + Points = Status

  • 10 points awarded for Correct Answers
  • 5 points awarded for Helpful Answers
  • 10,000+ points
  • 1,001-10,000 points
  • 501-1,000 points
  • 5-500 points