4 Replies Latest reply on May 22, 2012 8:17 AM by the_wine_snob

    Can I correlate timeline clips to "master" videofiles

    ForumCruiser Level 1

      Hi,

       

      I need to recreate a project which is corrupt. I have set main in/out points in the master clips in the preview but then I have made a lot of cuts and edits on the timeline.

       

      Is there a way of correlating the timeline frames to the main videos in the project window? I'd like to save some time here instead of going throught the entire edit procedure again.

       

      Thanks in advance.