1 Reply Latest reply on May 29, 2007 6:39 AM by Devdoc

    Controling movie to stop 10 sec -and then run again

    Jean_Bang
      Hey

      I'm making a flv incl. a movie. I would like the movie to stop now and then (to put some animations on top of it) and then run after lets say 10 sec - this has to be timer controled. How do i script this in actionscript 2.0? and will I be able to use it again in the same flv?

      Thank you very much !

      br/jean
        • 1. Re: Controling movie to stop 10 sec -and then run again
          Devdoc
          Hello!
          Your best bet might be to try an interval that will unpause your movie after ten seconds or so. Just have it set the duration of the inteval as a parameter if you have difrent length of your pauses. If you need to determine when to pause the move you can use a listener to the time property of your NetStream object. Anyway, here is a simple way to pause: