0 Replies Latest reply on Jan 4, 2015 6:22 PM by tcbbttb

    240fps to play as 120fps

    tcbbttb

      So Im curious about the math to figure out how to get footage shot at 240fps to playback as if it was shot at 120fps or 90fps etc..

       

      I have footage shot at 240fps and a 23.976 timeline I want to tell Premiere to interpret the footage to play it as if it were originally shot at 120fps but I am getting lost in the math.

      I really just want to know how to do the math for this.

       

      Thanks