2 Replies Latest reply on Jan 21, 2007 9:01 AM by wellmanguy

    Determining Running Time on a Project

    wellmanguy
      I've constructed a few projects in Captivate 1 & 2. The projects have been imported PowerPoint slides with narration added to them. This may be a real simple question that I am just over looking....

      Students have asked me to post "running times" along with the projects so they can get a feel for how long they will need to set aside before starting up one of the sessions. I hadn't thought about this going in. Is there a one-stop location in Captivate 2 where I can look up an estimated running time on the project I have loaded? I realize I could go through and add up the time for each slide. Just wanted to check and see if there was a one-stop option.

      Thanks for any help.