4 Replies Latest reply on May 28, 2008 11:46 AM by (raymond_setzer)

    working with long 1.5 hour xvid movies in ae

      This is a workflow question, how is it usually done if i need a few 30 second clips in AE from a full 1.5 hour movie? How can i cut this long movie3 into sizeable pieces for AE? Do i first make the clips then import them into AE or do i do the cutting in AE and get all my work done there? I can get it done but i dont know what the right way of going about it is. Thanks and sorry if this is mute.