4 Replies Latest reply on Oct 7, 2009 12:16 PM by Ned Murphy

    MC: attach-remove-attach sequence?

    shintashi Level 1

      I'm trying to swap movieclips in and out of an area, rather than loading an endless number via attach/getNextHighestDepth. Is there a way to swap my attached movieclip A with a new attached movieclip B, so that either clip A or Clip B is loaded, but not both?

       

      Because my current program uses attached files of identical size that overlap, I didn't realize there was a problem until things slowed down. I checked my number of objects in the debug list between hitTests and lo and behold, the list of objects got longer each time, even though to the viewer, it looked the same.

       

      Thanks.