2 Replies Latest reply on Aug 23, 2010 9:37 AM by Jeff S GP2

    Time stretch: ramp increase/decrease

    Jeff S GP2 Level 1

      Is it possible to gradually increase /decrease the % of a video?

       

      I have TGA footage that I’d like to begin at normal speed then gradually increase this to about 50%.

       

      I’m fairly certain the built in Tim Stretch functionality isn’t capable of this, but was wondering if there was perhaps an expression, or clever workaround?

       

      Any ideas?

       

       

      Thanks

      Jeff