2 Replies Latest reply on Dec 6, 2010 3:25 PM by Jim_Simon

    DVX100 29.97 (24p)

    tclark513 Level 3

      DVX100 clip properties reads "29.97 (24p)" which means it's 23.976 wrapped in a 29.97 wrapper.

      When I drag a clip onto the new item icon Premiere creates a 23.976 sequence.  Is this a bug?

      I think it should be creating a 29.97 sequence correct?

        • 1. Re: DVX100 29.97 (24p)
          Colin Brougham Level 6

          You can edit in either. You probably shot in 24pA, which has a 2:3:3:2 pulldown cadence that makes creating a 24p sequence easier. I use 24p sequences most of the time, especially for web stuff, but you can just manually create a 29.97 (NTSC DV) sequence and use that.

           

          What you may have to do, first, is to right-click the footage, go to Modify > Interpret Footage, and uncheck the Remove 24p Pulldown box. That will treat the clips as 29.97; you should be able to do the drag to the New Item button routine then.

          • 2. Re: DVX100 29.97 (24p)
            Jim_Simon Level 8

            Unless you need to include some genuine 30i footage, I'd leave things as they are and just edit at 24p.