4 Replies Latest reply on May 20, 2011 8:37 AM by the_wine_snob

    How do I adjust Timeline length?

    qtCheet

      Hello,

       

      I know Pr automatically extend the timeline length but I ran into a problem when the Timeline's grown to 4hr whereas all my assets are 2hr long.

      Is there any way to shorten the length (they are blank video anyway) of the Timeline?

       

      It is also weird to see the existence of several Edit Points after the 2hr video cut off, I believe that is what's causing the excessive Timeline. However, there isn't any asset on the Timeline as indicated by those Edit Points.

       

      Any help is appreicated.

       

      Thanks very much!