5 Replies Latest reply on Sep 29, 2011 10:00 AM by ssccuubbaattvv

    Moving a Pro 1.5 timeline into CS5.5

    ssccuubbaattvv Level 1

      I'd like to move a Pro 1.5 timeline into CS5.5.

       

      I'm able to move it as a Sequence along with all the clips, but if I can get the timeline into CS5.5 exactly as it is configured with tracks and clips instead of reconstructing the whole timeline/program I'd be very happy. If possible, could you tell me how this is done?

       

      Thanks.