2 Replies Latest reply on Feb 8, 2012 9:06 PM by stuffandsuchpros

    Due date?

    stuffandsuchpros

      I'm looking to use Adobe FormsCentral for checking out equipment in our high school photo class. The idea is to have 1 form for checking it out, and a second form for checking it back in. So since the cameras our students check out are always due the next day, ideally we would like to set a due date that makes it required for them to finish the second form within 24 hours of submitting the first.

       

      Is this a pipe dream, or is there a way to do it??